Russian Federation
2013
In order to compress the gas coming from the Vostochno-Tarkosalinskoye field, discovered in 1971, which is the most drilled field in the portfolio of PJSC NOVATEK with gas production since 1998 and with proven gas reserves (SEC) in the amount of 67 billion cubic meters, NOVATEK – TARKOSALENEFTEGAZ LLC decided to build an additional stage of the Booster compressor station (DCS).
Our company-Energeticheskiy Standart LLC, in 2013, delivered gas Pumping units GPA-C-16 (2nd ed.) based on 295gts2-238/47-80M1 centrifugal compressors with a gas turbine drive of the PS-90GP type (2nd ed.) to the newly constructed DCS line.
Delivered GPA-C-16 - in a block-modular design, which includes a system of "vsasa-exhaust", AVO, fuel and buffer gas preparation systems, warning and fire extinguishing systems, automatic control systems, etc.
The equipment was delivered "turnkey" with the necessary installation supervision and commissioning, as well as training of the Customer's personnel.
Currently, the DCS of the Vostochno-Tarkosalinsky field is successfully operated by the Customer and provides the necessary volume of gas compression and pumping to domestic consumers.