Republic of North Ossetia
2010-2019
Design, supply, commissioning
Zaramagskaya HPP
What was done:
Design, supply of 2 sets of pre-turbine ball valves with control and automatic control system, installation supervision, commissioning supervision.
Short description:
Comprehensive delivery, installation supervision, and commissioning of equipment with technical support before commissioning. Unique design. The largest installed ball valve on the territory of the Russian Federation. The highest-pressure (619 meters) hydroelectric power station in Russia.