Substation 500 kV "Ozernaya" – delivery of two controlled shunt reactors RTU-100000/220-УХ1 for the needs of JSC "Irkutsk electric grid company"

In 2018, the company "Energy Standard" was delivered two controlled shunt reactors, 220 kV 100 MVAr production PJSC "Zaporozhtransformator" for installation on substation 500 kV "Ozernaya" Western electric networks of JSC "IESK".

Substation 500 kV "Ozernaya" built in the Irkutsk region for electricity supply of the constructed Taishet aluminum factory and ensure capacity output of the Boguchanskaya HPP.

It should be noted that this is not the first usr installed on the 500 kV Ozernaya PS. Earlier, in 2014, two 500 kV usrs with a capacity of 180 MVAr were put into operation at the 500 kV Ozernaya substation.