Russia Dagestan
2015
design, delivery, commissioning
RusGidro
Gotsatlinskaya hydroelectric power station - design, supply, commissioning
What we did: design, supply, installation supervision, and commissioning of disc valves and hydraulic turbine equipment.
Brief description: comprehensive delivery, installation supervision and commissioning before the start of two sets of hydraulic turbine equipment with a control system. Comprehensive delivery, installation supervision and commissioning before the start-up of two sets of butterfly valves with a control system. New built hydroelectric power station commissioned on October 01, 2015.